![[Image: b-eastlndn.jpg]](http://www.trilon.com/bapom/images/b-eastlndn.jpg)
Data: 10 de Março de 2009
Hora: 22H00 (Portugal Continental, GMT)
Lobby: VROC
Servidor de treino lançado no VROC.
GPLRank: -77.628 (101)
Monster Rank: -327.608 (145)
GPL65Rank: -36.770 (9)
GPL65RankV2: -33.640 (10)
GPL69Rank: -54.065 (15)
Monster Rank: -327.608 (145)
GPL65Rank: -36.770 (9)
GPL65RankV2: -33.640 (10)
GPL69Rank: -54.065 (15)

